Transport
Shudehill Interchange ↗
Tram and bus connections across Greater Manchester.

Goulden Street · New Cross, Manchester
Eighty-two homes around a landmark
from Manchester’s industrial past.
Illustrative developer CGI. Final specification is subject to contract.
On Goulden Street, the listed chimney of a former police and fire station stands at the heart of a new residential courtyard.
The station dates to the 1870s. The plans retain its chimney and add a lantern at its summit. The building sits between Ancoats and the Northern Quarter, on the corner of Goulden Street and Cross Keys Street.
Across the scheme, homes include one- and two-bedroom apartments, mezzanines and duplexes. Selected homes have private terraces. Shared plans include a residents’ dining space, digital concierge, and cycle and parcel storage. CERT is the development manager and expected operator.

The 20 November 2026 schedule showed 13 one-bedroom and 17 two-bedroom homes available. Compare up to three layouts. IGA will reconfirm availability for your shortlist.
Floorplan explorer

Original developer floor drawing. Layouts are indicative.
4 homes on this floor match your filter.
Select up to three apartments across any floors to compare them here.
New Cross, Manchester
Cross Keys Street and Goulden Street frame the site. The Northern Quarter, Mackie Mayor and Shudehill are nearby.
Open location in Maps ↗Transport
Tram and bus connections across Greater Manchester.
Transport
Mainline rail and Metrolink connections to the north of the city centre.
Neighbourhood
Food hall in a former market building in the Northern Quarter.
Neighbourhood
Ancoats square near restaurants and Hallé St Peter’s.
Green space
Public green space near NOMA, west of the site.
Developer CGIs are illustrative. Furniture, finishes and outlook vary by apartment.
Proposed finishes include fitted cabinetry, a Silestone worktop, an induction hob and integrated appliances.
Wide-plank flooring, electric heating and an entry intercom feature in the proposed specification.
The proposed scheme includes large-format tiles, contemporary fittings and a heated towel rail. Check the contract specification for your home.
The lightweight frame had reached level eight when the August report was issued.
The developer also reported that heritage sign-off allowed the scaffolding around the chimney to come down. The August report targeted Q3 2027.
Ask IGA for the latest programme and the contractual completion date for your apartment.
The development is on Goulden Street in New Cross, between Ancoats and the Northern Quarter in Manchester M4.
The 20 November 2026 release showed 13 one-bedroom and 17 two-bedroom homes available. Compare up to three by floor, layout, size and outlook. IGA will reconfirm availability before reservation.
The developer targeted Q3 2027 in its August 2026 construction report. Ask IGA for the latest programme and the contractual date for your chosen home.
We email links to two PDFs: the 25-page IGA Global investment presentation and the 13-page architectural floorplans. The development presentation covers the building, typical plans, interior specifications, Manchester neighbourhoods and purchase information. IGA can confirm the current figures for a particular apartment.
Ask about a particular apartment, request the investment pack or arrange a private consultation with Dale Anderson.
Peelers Yard is preselected on Dale’s booking calendar. Include your apartment shortlist when you enquire so IGA can check the latest availability.
Capital is at risk. Property values and rental income can fall as well as rise.